亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

Updated: 2014-04-01

The 550MW water-turbine generator units at the Ertan Hydropower Station had the largest single-unit capacity in China in the twentieth century. The consortium led by CGGC installed as many as four 550MW units for one single hydropower station in one installation workshop within one year, creating a national record in this field.

Electromechanical Equipment Installation at the Ertan Hydropower Station (China)

Electromechanical Equipment Installation at the Ertan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.