亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/News

CEEC wins wind-light storage and transmission demonstration extension project

Updated: 2013-09-04

On Aug 20, CEEC won the construction & installation project of wind generating set and blower box of Zhangshang wind power plant, which is a wind-light storage and transmission demonstration extension project (phase II), involving construction and installation of thirty-eight 3.0MW blowers and blower boxes, mainly including the foundations of wind turbine generator and box-type transformer substation, etc.

As the world's largest platform for comprehensive utilization of new energies integrating wind electricity, photovoltaic power generation, energy storage and intelligent power transmission, the project transforms the random, fluctuating and unstable electric power into stable and sustainable green energy through integrated wind-light complementation, energy storage regulation and intelligent scheduling, thereby realizing stable and controllable new energy power generation and breaking the bottleneck of instable green energy.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.