亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/News

Bridge Crane Gantry completed in Houay Lamphan Gnai Hydropower Station ahead of schedule

Updated: 2013-07-26

On July 18, the CGGC-undertaken power plant of Houay Lamphan Gnai Hydropower Station in Laos completed concrete casting of the bridge crane gantry 43 days ahead of schedule.

The gantry was designed to be a twelve-truss prefabricated structure with a maximum weight of 14 tons. The Project Department did this work by on-site casting thus ensured both efficiency and structural safety, and facilitated the following installation of the steel roof trusses and generator units.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.