亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

 
 

Home/News

No.1 branch tunnel of the water diversion tunnel of Sopladora Hydropower Station finished

Updated: 2012-06-25

Lately, the No.1 branch tunnel of the water diversion tunnel of Sopladora Hydropower Station has been finished in Ecuador, with the supporting system completed two days ahead of schedule.

The No.1 branch tunnel extends 335.95 meters. The project department, despite the complicated geological conditions, high safety risks, great construction difficulties, tight schedule and the communication problem with foreign staff, made concerted efforts and a careful plan, optimized the construction design, and completed the project two days ahead of schedule, laying an essential foundation for the excavation of the water diversion tunnel.

The 4.7km-long water diversion tunnel is under excavation in a well-organized fashion.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.