亚洲视频免费一区,国产欧美综合一区二区,亚洲国产观看,91精品啪在线观看国产91九色,日本又黄又粗暴的gif动态图含羞,麻豆国产一区二区在线观看,中文字幕在线二区

Your’re Here : Home > News

The first node work launched for Qatar Mega Reservoir Package E

Updated: 2015-12-28

On 23 December, 2015, the Qatar Mega Reservoir Package E, constructed by CGGC, has achieved remarkable progress in contract performance. The water-supply pipeline installation, the first node of this project, was launched 15 days ahead of the planned date, setting a good beginning for project management and laying a solid foundation for its overall performance.

The first node work launched for Qatar Mega Reservoir Package E
Jobsite of the bypass-pipe interconnection and installation

The first node work of Qatar Mega Reservoir Package E includes the installation of the DN1200-1600mm pipe as long as 11.2km, containing 14 valve stations and 16 anchorage blocks along the line. The members of the Project Department have acquitted themselves well in examining suppliers, making orders, inspection, transportation, customs clearance, external corrosion prevention, pipe ditch excavation and other preparations. Currently, they are engaged in constructing the valve station and anchorage block. As the first supplier participating in node construction of this engineering contract, the joint venture led by CGGC has been highly praised by the project owner for its outstanding progress, excellent quality and effective on-site management.

> Links> Contact Us
Tel :+86-10-59525952 Fax : +86-10-59525951
Address: Tower F, Ocean International Center, 208 Ciyunsi Beili, Chaoyang District, Beijing (100025), P.R. China
Copyright ? 2013 China Gezhouba (Group) Corporation. All rights reserved.