China-Laos Railway completes cross-border tunnel
Share - WeChat

[Video/Yao Wei, Chen Chang and Wang Yufei]
The cross-border tunnel on the China-Laos Railway was completed on Sunday, laying a solid foundation for the full operation of the whole line.
Dubbed as the "friendship tunnel," it covers a total length of 9.59 kilometers, with 7.17 kilometers on the Chinese side and 2.42 kilometers on the Lao section.
Using China's technical standards and equipment, the China-Laos Railway measures more than 1,000 kilometers from Kunming, Southwest China's Yunnan province, to Vientiane, capital of Laos. The project is scheduled to be completed and opened to traffic at the end of 2021 and will cut the travel time between Kunming and Vientiane to 12 hours.
- 'Treasure Island' song highlights PLA resolve
- Party at backstage of float parade in Shanghai
- Hainan holds foreign-focused symposium to optimize its international portal
- Shanghai Tourism Festival dazzles with grand float parade
- Election of Macao's 8th Legislative Assembly commences
- International Universities Rowing Open kicks off in East China